Biomass Conversion
Overview of college
• All-electric campus (pre-conversion)
• 450,000 square
feet
• 5,000 day and evening students
The Biomass District Heating System
• Start-up date: December 2002
• Closed loop, two
pipe hydronic heating system
• New
heating plant building
• 8Mbtu (million British
thermal units) Messersmith Combustion unit
• Hurst boiler
• Chip storage: 85 tons
• Projected annual chip
consumption: 1000 tons
• Actual
consumption 2002-2003 heating season: 854 green
tons
• Actual consumption 2003-2004 heating season:
1212 green tons
• Feedstock: green hardwood sawmill
residue chips
• Back-up
system: 320bhp (base horsepower) Clever-Brooks
#2 oil burner
• Emission controls: LSR Technologies Inc.,
Core Separator
Note: Summer 2004; Emission Control system has been
replaced with a baghouse system to capture a larger
percentage of particulate matter
Significance of Biomass Conversion at MWCC
• Lessen dependence on foreign oil
• Demonstrated use of
a sustainable feedstock
• Addresses
the nation's energy and homeland security policies
• Stimulate local economy
• Eliminate woody biomass from
the waste stream
• Demonstrate
technologies that reduce greenhouse gas
• Potential
demonstration site for other biomass renewable
technologies
• Outreach educational program on biomass
technologies
top of page
Biomass Conversion Economics
Project cost: $4,337,911 ((total for all Energy Conservation
Measures (ECM) at MWCC))
Project cost breakdown:
• Electric to Biomass Heat Conversion: $2,914,375
Power
plant construction, equipment, feedstock handling system,
chip storage unit, emission controls, control software,
oil backup system, permitting, engineering design,
project management, materials and labor.
• All other ECM’s: initial energy audit, engineering
and design, lighting, water conservation, variable
frequency drive units on air handlers, domestic
hot water conversion, unit ventilator replacement,
parking lot lighting, and greenhouse conversion
Funding Sources, Cost Breakdown, and Savings
• US Department of Energy Appropriation: $1,000,000
• Mass
Electric Rebates: $173,914
• MA
Department of Capital Asset Management (DCAM)
• Deferred
maintenance: $344,999
• Mass Technology
Collaborative (MTC)
• Renewable
Energy Trust Fund: $750,000
• Tax
Exempt Lease Purchase (TELP): $1,861,300 (funded
by guaranteed energy savings)
• Pre-conversion
electricity usage: 8,600,000
kWh/yr
• Post conversion electricity usage: 6,277,600
kWh/yr
• Pre-conversion
electric energy cost: $750,000/yr
• Post
conversion electric energy cost: $587,531/yr
• Estimated
energy savings: 3.3 MkWh/yr
• TELP
annual payment: $264,306
• Guaranted
Energy Savings: $272,826/yr
• Positive
Cash Flow Year 1: $8,520
NOTE: Electrical default rate before conversion: $.043/kWh.
Current default rate: $.067/kWh
College operating hours have increased due to additional
course and program development, more community usage,
12,000 sq. ft. addition, increased computer labs, etc.